Cúpica – Urabá

Railway project between the municipalities of Cúpica (Chocó) and Turbo (Antioquia)

Summary


Objective

Define and develop an efficient railway corridor between Cúpica and Turbo that optimizes logistics times and costs, meets technical and environmental standards, and strengthens regional connectivity.

Key Goals

  • Evaluate and select the optimal 198.6-km alignment with tunnels and viaducts.
  • Develop prefeasibility and feasibility studies in compliance with technical standards.
  • Define PPP participation and financing scheme.
  • Ensure environmental compliance and social management.

Market Opportunity

Rail transport has lagged behind road transport. A modern railway corridor between Cúpica and Turbo offers enhanced competitiveness, reliability, and reduced freight transport costs, complementing the national network.

ESG Considerations

Environmental: Design includes viaducts and tunnels to minimize impacts and protect ecosystems; wildlife passage measures.

Social: Local job creation and productive linkages; improved regional connectivity.

Governance: Evaluation under CONPES and MHCP/DNP frameworks; coordination among ANI, UPIT, and territorial entities

 

Financial Indicators


IRR

N/A.

(project in profiling/prefeasibility; returns not yet calculated)..

NPV

N/A.

(projections under development; subject to demand and financial structure studies).

Project Schedule


Profiling completed/transferred to UPIT.

Duration: Not estimated

Prefeasibility: route definition and CAPEX/OPEX estimates.

Duration: To be defined by UPIT

Feasibility and PPP structuring.

Duration: After prefeasibility

Construction and commissioning

Duration: According to structuring results.

Business Model


Key Partners

  • National Infrastructure Agency (ANI)
  • Transport Planning Unit (UPIT)
  • National Government and territorial entities
  • Private investors/concessionaires

Key Activities

  • Route, prefeasibility, and feasibility studies.
  • Technical, financial, and legal structuring (PPP).
  • Environmental and social management.
  • Construction, operation, and maintenance of the corridor.

Value Proposition

  • Reduced freight transport times and costs.
  • Improved reliability and capacity of the rail system.
  • Sustainability focus with lower environmental impact.

Customer Segments

  • Productive chains and companies with freight needs.
  • Logistics operators.
  • National and territorial governments.
  • Local communities benefiting from employment and infrastructure.

Revenue Streams

  • Railway concession/operation revenues.
  • Regulated tariffs and fees.
  • PPP schemes with early-stage public leverage.

Cost Structure

  • CAPEX and OPEX depending on scenario.
  • Study and environmental licensing costs.
  • Construction, operation, and maintenance of the line.

Risk Plan


Event Probability Impact Rating
Alignment definition and complexity (tunnels/viaducts) Medium High Significant
Structuring and investment costs Medium High Significant
Environmental management and licensing Medium High Significant
Social management and community acceptance Low Medium Moderate
$28 billones COP escenario captable

STATE: In progress
Download Brochure

Request Advice

I accept the Privacy Policy and the processing of my data.
Enter security code:
 Security code

Similar Projects (Seeking Investment)

Texto alterno

International Airport - Meta

Mobility and transport > Aerospace Transport

CAPEX USD 108 millones (GBP 86 millones) - OPEX USD 132 millones (GBP 105 millones)

Location

Total investment: ~COP 928 billion (CAPEX USD 108 million / OPEX USD 132 million). Terminal 16,000 m², runway 3.2 km.

CAPEX USD 108 millones (GBP 86 millones) - OPEX USD 132 millones (GBP 105 millones)

View project International Airport - Meta
Icon of a train carriage

Bogotá – Central Railway Corridor

Mobility and transport > Rail Transport

$22 billones COP

Location

Connect the Bogotá–Cundinamarca Metropolitan Region with the Central Railway Corridor through a modern, intermodal railway system that reduces logistics times and costs, strengthening national competitiveness.

$22 billones COP

View project Bogotá – Central Railway Corridor
Texto alterno

Navigability of the Meta River

Mobility and transport > River and Maritime Transport

No se disponen de proyecciones financieras ni cifras presupuestarias.

Location

The aim is to establish a public-private partnership project to reactivate river transport on the Meta River, including the design, construction, operation and maintenance of the necessary infrastructure.

No se disponen de proyecciones financieras ni cifras presupuestarias.

View project Navigability of the Meta River
Icono de un avión con un chulito

Aircraft Inspection - Valle del Cauca

Mobility and transport > Aerospace Transport

$ Entre USD 10 y 90 millones dependiendo de la cantidad de hangares

Location

Establish a world-class aircraft maintenance, repair and overhaul (MRO) facility at Alfonso Bonilla Aragón Airport to provide services to airlines in Latin America, the United States, Mexico and Europe.

$ Entre USD 10 y 90 millones dependiendo de la cantidad de hangares

View project Aircraft Inspection - Valle del Cauca
General

El Dorado Airport – Maximum development EDMAX

Mobility and transport > Aerospace Transport

12.690 billones COP

Location

Consolidate El Dorado as a leading hub in Latin America.

12.690 billones COP

View project El Dorado Airport – Maximum development EDMAX
Metro train head icon

Pacific Railway

Mobility and transport > Rail Transport

$18 billones COP

Location

The project aims to connect the Port of Buenaventura with the Central Railway Corridor to optimise freight transport.

$18 billones COP

View project Pacific Railway

Request Advice

I accept the Privacy Policy and the processing of my data.
Enter security code:
 Security code
In progress $28 billones COP escenario captable