We use our own and third-party cookies to improve your experience. Set your preferences.By continuing to use this website, you are accepting our Cookie Policy.
Essential / Technical: Required for browsing the site (always active).
Analytics: These allow us to measure site traffic and performance (e.g. Google Analytics).
Personalisation: These remember your user preferences or content feeds.
Comprehensive urban project within the ‘Green Corridor’ that links a regional mass transport system with urban renewal, green areas, public spaces and facilities, restoring the old railway line.
Implement an efficient, environmentally sustainable mass transit system that connects the region, improves mobility and competitiveness of the City-Region, and promotes transit-oriented urban renewal.
33% reduction in travel times and traffic accidents; one million people benefited; integration with densification and urban renewal processes in the 'Green Corridor'; high potential demand in the Cali–Jamundí, Cali–Yumbo, and Palmira–Cali Central axes.
Environmental: Reduction of 1.2 million tons of CO₂; integration of green areas and public space; compliance with environmental licenses and permits.
Social: Reduction in road accidents; direct job creation; prior consultations and compensation agreements implemented by the private partner according to contractual obligations; resettlements managed by the operating entity.
Governance: Participation of national, regional, and local governments and private partners; supervision by ART; structuring by FDN; bidding and concession processes under Law 80.
.
Duration: 24 months
Duration: 36 months
Duration: 19 months
Duration: 56 months
Mobility and transport > Aerospace Transport
CAPEX USD 108 million (GBP 86 million) - OPEX USD 132 million (GBP 105 million)
Total investment: ~COP 928 billion (CAPEX USD 108 million / OPEX USD 132 million). Terminal 16,000 m², runway 3.2 km.
Mobility and transport > Rail Transport
$22 billions COP
Connect the Bogotá–Cundinamarca Metropolitan Region with the Central Railway Corridor through a modern, intermodal railway system that reduces logistics times and costs, strengthening national competitiveness.
Mobility and transport > River and Maritime Transport
Given the current progress of the consultancy on the feasibility of the Meta River Navigability project, financial projections and budget figures are not yet available
The aim is to establish a public-private partnership project to reactivate river transport on the Meta River, including the design, construction, operation and maintenance of the necessary infrastructure.
$ Between USD 10 to 90 million depending on number of hangars
Establish a world-class aircraft maintenance, repair and overhaul (MRO) facility at Alfonso Bonilla Aragón Airport to provide services to airlines in Latin America, the United States, Mexico and Europe.
COP 12,690 billion
Consolidate El Dorado as a leading hub in Latin America.
$18 billions COP
The project aims to connect the Port of Buenaventura with the Central Railway Corridor to optimise freight transport.