We use our own and third-party cookies to improve your experience. Set your preferences.By continuing to use this website, you are accepting our Cookie Policy.
Essential / Technical: Required for browsing the site (always active).
Analytics: These allow us to measure site traffic and performance (e.g. Google Analytics).
Personalisation: These remember your user preferences or content feeds.
Establish a world-class aircraft maintenance, repair and overhaul (MRO) facility at Alfonso Bonilla Aragón Airport to provide services to airlines in Latin America, the United States, Mexico and Europe.
World-class MRO center in Cali to serve airlines from the Americas, the United States, Mexico, and Europe.
Strategic location. Optimal climate. Human capital: 39,000 professionals and 41,000 technicians.
Environmental: Regulatory compliance.
Social: Specialized employment.
Governance: N/A
Duration: 1–2 years.
Mobility and transport > Aerospace Transport
CAPEX USD 108 million (GBP 86 million) - OPEX USD 132 million (GBP 105 million)
Total investment: ~COP 928 billion (CAPEX USD 108 million / OPEX USD 132 million). Terminal 16,000 m², runway 3.2 km.
Mobility and transport > Rail Transport
$22 billions COP
Connect the Bogotá–Cundinamarca Metropolitan Region with the Central Railway Corridor through a modern, intermodal railway system that reduces logistics times and costs, strengthening national competitiveness.
Mobility and transport > River and Maritime Transport
Given the current progress of the consultancy on the feasibility of the Meta River Navigability project, financial projections and budget figures are not yet available
The aim is to establish a public-private partnership project to reactivate river transport on the Meta River, including the design, construction, operation and maintenance of the necessary infrastructure.
COP 12,690 billion
Consolidate El Dorado as a leading hub in Latin America.
$18 billions COP
The project aims to connect the Port of Buenaventura with the Central Railway Corridor to optimise freight transport.
1.102 billions COP
New 17,360 m² terminal, refurbishment of the existing terminal and car park for 330 vehicles.