Saltar al contenido principal
Colombian Government Logo

Rafael Núñez Airport

New 17,360 m² terminal, refurbishment of the existing terminal and car park for 330 vehicles.

Summary


Objective

Modernize and ensure service continuity for 8.5 years.

Key Goals

  • Construction of new terminal.

Market Opportunity

ICAO 4D Airport. Projected 8 million passengers.

ESG Considerations

Environmental: Transfer/modification of environmental license.

Social: 13,741 jobs generated.

Governance: N/A

 

Financial Indicators


CAPEX

COP 582 billion

OPEX

COP 520 billion

Projected Revenue

COP 1.86 trillion

Project Timeline


Pre-construction

Duration: 1 year

Construction

Duration: 2.5 years

Operation

Duration: 4.5 years

Business Model


Model Type

  • PPP, originator: SACSA S.A.

Key Partners

  • SACSA S.A.

Risk Plan


Event Probability Impact Rating
Environmental procedures N/A N/A Risk
1.102 billones COP

STATE: In progress
Download Brochure

Request Advice

I accept the Privacy Policy and the processing of my data.
Enter security code:
 Security code

Similar Projects (Seeking Investment)

Texto alterno

International Airport - Meta

Mobility and transport > Aerospace Transport

CAPEX USD 108 millones (GBP 86 millones) - OPEX USD 132 millones (GBP 105 millones)

Location

Total investment: ~COP 928 billion (CAPEX USD 108 million / OPEX USD 132 million). Terminal 16,000 m², runway 3.2 km.

CAPEX USD 108 millones (GBP 86 millones) - OPEX USD 132 millones (GBP 105 millones)

View project International Airport - Meta
Icon of a train carriage

Bogotá – Central Railway Corridor

Mobility and transport > Rail Transport

$22 billones COP

Location

Connect the Bogotá–Cundinamarca Metropolitan Region with the Central Railway Corridor through a modern, intermodal railway system that reduces logistics times and costs, strengthening national competitiveness.

$22 billones COP

View project Bogotá – Central Railway Corridor
Texto alterno

Navigability of the Meta River

Mobility and transport > River and Maritime Transport

No se disponen de proyecciones financieras ni cifras presupuestarias.

Location

The aim is to establish a public-private partnership project to reactivate river transport on the Meta River, including the design, construction, operation and maintenance of the necessary infrastructure.

No se disponen de proyecciones financieras ni cifras presupuestarias.

View project Navigability of the Meta River
Icono de un avión con un chulito

Aircraft Inspection - Valle del Cauca

Mobility and transport > Aerospace Transport

$ Entre USD 10 y 90 millones dependiendo de la cantidad de hangares

Location

Establish a world-class aircraft maintenance, repair and overhaul (MRO) facility at Alfonso Bonilla Aragón Airport to provide services to airlines in Latin America, the United States, Mexico and Europe.

$ Entre USD 10 y 90 millones dependiendo de la cantidad de hangares

View project Aircraft Inspection - Valle del Cauca
General

El Dorado Airport – Maximum development EDMAX

Mobility and transport > Aerospace Transport

12.690 billones COP

Location

Consolidate El Dorado as a leading hub in Latin America.

12.690 billones COP

View project El Dorado Airport – Maximum development EDMAX
Metro train head icon

Pacific Railway

Mobility and transport > Rail Transport

$18 billones COP

Location

The project aims to connect the Port of Buenaventura with the Central Railway Corridor to optimise freight transport.

$18 billones COP

View project Pacific Railway

Request Advice

I accept the Privacy Policy and the processing of my data.
Enter security code:
 Security code
In progress 1.102 billones COP