Southwest – Cali (Alfonso Bonilla Aragón) and Neiva (Benito Salas) Airports

Expansion and modernisation of Alfonso Bonilla Aragón Airport (Cali) and Benito Salas Airport (Neiva).

Summary


Objective

Modernize southwestern airports and create a sub-account for Buenaventura.

Key Goals

  • Expansion of terminals and aprons.

Market Opportunity

Projected traffic Cali: 16.3 million passengers.

ESG Considerations

Environmental: N/A

Social: Economic reactivation in remote areas.

Governance: N/A

Financial Indicators


CAPEX

COP 1.428 Trillion

OPEX

COP 2.842 Trillion

Total Investment

COP 4.270 Trillion

Zona Franca onshore (12,2 ha)

USD 20 millones
100 % equity

Equity comprometido

USD 394 millones

TIR neta

26,2 % a 12 años · 16,1 % a 20 años
(sin salida-venta)

MOIC (múltiplo de inversión)

8,9x a 12 años · 5,7x a 20 años

Payback

12 años

Financiación de expansiones

Deuda corporativa y flujo de caja, sin diluir al accionista

Fuentes de ingresos por unidad de negocio

Unidad Base tarifaria Volumen
Carga contenerizada Tarifa por TEU (gateway y transbordo) 1,6 M TEU (2031) a 4,0 M TEU (2051)
Carga líquida y gas Tarifa por m³ o tonelada manejada 60.000 m³ GNL · 40.000 t GLP · 160.000 t aceites y refinados
Venta de energía Tarifa por MWh inyectado al STN 200 MW de autogeneración
Bunkering y refinación Tarifa por barril o tonelada suministrada GNL, metanol, IFO y MDO a buques
Zona Franca Canon por m² y servicios logísticos 12,2 ha de parque industrial y bodegas

Project Timeline


Concession

Duration: 30 years

Concesión y cierre de la estructura de capital

Duración: 2 años.

Cierre financiero

Construcción onshore y plataforma offshore inicial (Zona Franca y líquidos)

Duración: 2 años.

Operación comercial parcial

Construcción de la terminal de contenedores

Duración: 2 años.

Operación comercial completa
\*Predecesor: estructuración legal primaria.

Business Model


Model Type

  • PPP (Public-Private Partnership)

Originators

  • AENA and Corficolombiana

Fuentes de ingresos

  • Tarifas por movimiento de contenedores.
  • Arriendo de capacidad criogénica de tanques (GNL).
  • Despachos de refinación de palma e hidrocarburos.
  • Alquileres en la Zona Franca.
  • Facturación por suministro directo de bunkering.

Socios clave

  • Inversionistas institucionales
  • Estado colombiano
  • Cuatro consejos comunitarios de la zona, que forman parte de la coalición

Segmentos de cliente

  • Grandes exportadores e importadores
  • Cadenas logísticas globales
  • Empresas de manufactura

Canales

  • Conexión terrestre por las autopistas 4G (Mar 1, Mar 2 y Túnel del Toyo), que llegan directamente al puerto.
  • Rutas navieras del mar Caribe, a unas 250 millas del Canal de Panamá.

Alcance

  • Incluye: central termoeléctrica propia de 200 MW, concesión marítima (327,37 ha) y terrestre (8,21 ha), franja privada adicional (12,2 ha), viaducto marino (2,13 km), tuberías de fluidos, jetty para buques gaseros, muelle principal, patio industrial y Zona Franca adjunta.
  • No incluye: las inyecciones de capital para las expansiones de la terminal de contenedores previstas en 2037, 2042 y 2051, que se financiarán con deuda corporativa y flujo de caja del proyecto.

Risk Plan


Event Probability Impact Rating
Simultaneous operation with expansion works N/A N/A N/A
COP 4.270 billion

STATE: In progress
Download Brochure

Request Advice

Enter security code:
 Security code

Similar Projects (Seeking Investment)

Metro train head icon

Pacific Railway

Mobility and transport > Rail Transport

$18 billions COP

Location

The project aims to connect the Port of Buenaventura with the Central Railway Corridor to optimise freight transport.

$18 billions COP

View project Pacific Railway
Icon of a railway train

Interoceanic Rail Corridor

Mobility and transport > Rail Transport

$28 billions COP capture scenario

Location

Railway project between the municipalities of Cúpica (Chocó) and Turbo (Antioquia)

$28 billions COP capture scenario

View project Interoceanic Rail Corridor
New
Icon of a train carriage
New

Buenaventura – Palmira Corridor

Mobility and transport > Rail Transport

USD 5.3 billion

Location

The Buenaventura – Palmira Rail Corridor project seeks to reactivate and modernize the rail connection between Colombia's main Pacific port and the country's interior, through the construction, rehabilitation, and operation of a 120 km corridor. The initiative will reduce logistics costs, improve foreign trade competitiveness, boost rail transport, and lower the carbon footprint by partially shifting freight from road to rail.

USD 5.3 billion

View project Buenaventura – Palmira Corridor
New
Metro train head icon
New

Villavicencio – Puerto Gaitán Railway Line, Meta

Mobility and transport > Rail Transport

USD $5.31 billion

Location

The Villavicencio – Puerto Gaitán Rail Corridor project aims to develop a mixed-use (freight and passenger) rail connection between Villavicencio and Puerto Gaitán, strengthening the logistics integration of the Orinoquía region with national and international markets. The initiative involves the construction and operation of 193 km of rail network, boosting regional competitiveness, reducing logistics costs, and promoting a sustainable, intermodal transport system.

USD $5.31 billion

View project Villavicencio – Puerto Gaitán Railway Line, Meta

Success Stories

Texto alterno

International Airport - Meta

Mobility and transport > Aerospace Transport

CAPEX USD 108 million (GBP 86 million) - OPEX USD 132 million (GBP 105 million)

Location

Total investment: ~COP 928 billion (CAPEX USD 108 million / OPEX USD 132 million). Terminal 16,000 m², runway 3.2 km.

CAPEX USD 108 million (GBP 86 million) - OPEX USD 132 million (GBP 105 million)

View project International Airport - Meta
Icon of a train carriage

Bogotá – Central Railway Corridor

Mobility and transport > Rail Transport

$22 billions COP

Location

Connect the Bogotá–Cundinamarca Metropolitan Region with the Central Railway Corridor through a modern, intermodal railway system that reduces logistics times and costs, strengthening national competitiveness.

$22 billions COP

View project Bogotá – Central Railway Corridor
Icon of a person in a boat on the river

Navigability of the Meta River

Mobility and transport > River and Maritime Transport

Given the current progress of the consultancy on the feasibility of the Meta River Navigability project, financial projections and budget figures are not yet available

Location

The aim is to establish a public-private partnership project to reactivate river transport on the Meta River, including the design, construction, operation and maintenance of the necessary infrastructure.

Given the current progress of the consultancy on the feasibility of the Meta River Navigability project, financial projections and budget figures are not yet available

View project Navigability of the Meta River
Icono de un avión con un chulito

Aircraft Inspection - Valle del Cauca

Mobility and transport > Aerospace Transport

$ Between USD 10 to 90 million depending on number of hangars

Location

Establish a world-class aircraft maintenance, repair and overhaul (MRO) facility at Alfonso Bonilla Aragón Airport to provide services to airlines in Latin America, the United States, Mexico and Europe.

$ Between USD 10 to 90 million depending on number of hangars

View project Aircraft Inspection - Valle del Cauca
Icon of an airport runway with an airplane taking off

El Dorado Airport – Maximum development EDMAX

Mobility and transport > Aerospace Transport

COP 12,690 billion

Location

Consolidate El Dorado as a leading hub in Latin America.

COP 12,690 billion

View project El Dorado Airport – Maximum development EDMAX
Icon of a train seen from the front

Commuter Train - Valle del Cauca

Mobility and transport > Rail Transport

COP $10.790 Billion

Location

Comprehensive urban project within the ‘Green Corridor’ that links a regional mass transport system with urban renewal, green areas, public spaces and facilities, restoring the old railway line.

COP $10.790 Billion

View project Commuter Train - Valle del Cauca

Request Advice

Enter security code:
 Security code
In progress COP 4.270 billion